Mechanical & Plumbing

Medical Center Cooling Tower Replacement

On this design-build (d-b) project, Lyles Mechanical Co. (LMC) replaced the roof top cooling towers for the hospital central plant that provides 900 tons of cooling capacity for the hospital. The project required modifications to various piping systems as well as close coordination with the plant personnel to accommodate shutdown of the system. Working closely with the owner, implementing the desi...

More >>

Hartnell College Boiler & Chiller Project

This design/bid/build project involved the complete replacement of all of the mechanical equipment at the Student Administration Building on the main campus of the College. Located on the rooftop, the existing chiller, boiler, air compressor and all related piping and appurtenances were replaced. The work was scheduled and synchronized with the College Operations & Maintenance staff to ensure ...

More >>

Big Creek Elementary School Boiler Replacement

Lyles Mechanical Co., (LMC) performed the fast track installation of a new Hydronic Heating System for Big Creek Elementary School. The scope of the project included complete demolition of the existing mechanical room boiler, equipment and piping; and installation of two new boilers, a pump, expansion tank and air separator. New supply and return HHW piping as well as exhaust piping were installed...

More >>

Design - Build Services / HVAC and Plumbing

Lyles Mechanical Co. (LMC) provided HVAC and plumbing design-build services to the Pre-Engineered Building (PEB) Contractor at the Panoche Energy Center, a 400 MW power plant constructed by Kiewit Power Constructors Co. The mixed-use building was approximately 13,000 square feet with administrative offices, central control room, warehouse, and an electrical room. This project included a paperless ...

More >>

Pacific Ethanol Stockton, LLC - Administration/Maintenance Building

Lyles Mechanical Co. (LMC) managed the construction of this two story office, maintenance and control center building as a part of a $62,000,000 contract for Pacific Ethanol Inc. The two story building totals 11,500 sqft and was constructed using a CMU exterior shell with a metal deck/rigid insulation/single ply roof and metal stud framing for the interior offices & lab. The mechanical system ...

More >>

Campus Village Piping Replacement Project Phase 3 Construction Manager at Risk

Lyles Webcor a Joint Venture (LWJV) provided CM-at-Risk services for the delivery of this project to replace the domestic hot water system and make other building system improvements in San Jose State University’s Campus Village. Campus Village is the primary residential complex at SJSU and is comprised of a 1,000,000-SF, 5-building complex that includes a 15 story main tower. Phase 3 involved t...

More >>

Campus Village Water Softener & Pipe Replacement Project Phase 1&2

This design/bid/build project involved the replacement of over 6,000 LF of copper pipe and related components of the domestic hot water return system in a residential housing complex composed of five (5) buildings ranging from 7 to 14 stories. Campus Village is home to more than 2,200 residents (student and staff) during the school year and has year round residents in several of the buildings. To ...

More >>

Fresno Chaffee Zoo—Seal & Sea Lion Exhibit

As a member of the Matt Construction team, Lyles Mechanical Co. (LMC) was brought in at an early stage of preconstruction to provide constructability & budget review and value engineering for this high profile project at the Fresno Chaffee Zoo. LMC was the lead for the BIM coordination and our experienced staff was able to identify issues before they arose on the project to eliminate conflicts...

More >>

B. F. Sisk Courthouse Renovation

Lyles Mechanical Co. (LMC) was one of several major subcontractors on this project. LMC scope included installation of the Plumbing, HVAC and Hydronic piping in an existing five story courthouse including a basement. The basement and lower four floors were completely gutted and constructed as new construction while accommodating the existing structural elements. The fifth floor entailed modificati...

More >>

Site Hydronics - Design Build

On this design-build project, on a compressed schedule, Lyles Mechanical Co. (LMC) installed approximately 10,800 lineal feet of 2” through 8” diameter, below grade pre insulated chilled water (CHW) and heating hot water (HHW) piping. Pipe material included both PVC and carbon steel. Operations performed by LMC included layout of pre-engineered piping, Installation of pipe, welding of all conn...

More >>

800 Ton Chiller Replacement at Central Plant

Replacement of an existing 800 ton centrifugal chiller and related appurtenances at the Central Heating and Cooling Plant on the main campus. The project included replacing the refrigerant monitoring system, replacing the existing 10" & 12" welded steel CWS/R & CHWS/R lines to the chiller, and adding a small exhaust fan to purge the room in the event of a refrigerant leak. Workin...

More >>

CSU-Monterey Bay, Academic II Building

Lyles Mechanical Co. (LMC) is serving as the plumbing and mechanical trade contractor on the construction of this new 57,000 SF academic building on the main campus of CSU Monterey Bay. CSUMB is located on the former location of the US Army’s Fort Ord. LMC’s scope includes the installation of site chilled and heating hot water, building plumbing, and the HVAC wet and dry side mechanical system...

More >>

Tehachapi Critical Access Replacement Hospital

This multi-prime project consists of the installation of plumbing, medical gas piping, and equipment for a new 25-bed replacement critical access hospital in Tehachapi. This 78,979 SF facility will replace the existing hospital, to meet current California Seismic Safety Standards and Office of Statewide Health Planning and Development (OSHPD) review. In addition to performing all of the above and ...

More >>

CSU - Fresno New Chiller & Piping

This project included the installation of a new 1,200 ton centrifugal chiller with all of the required points of connection to the existing campus chilled water thermal storage and condenser water systems for supplemental campus cooling. This plan and specification project was 3-D (BIM) modeled in our engineering department. Fabrication drawings were developed then exported to our fabrication shop...

More >>