Campus Village Piping Replacement Project Phase 3 Construction Manager at Risk


August, 2012$9,121,000

Mechanical & Plumbing

Campus Village Piping Replacement Project Phase 3 Construction Manager at Risk

San Jose, California

Lyles Webcor a Joint Venture (LWJV) provided CM-at-Risk services for the delivery of this project to replace the domestic hot water system and make other building system improvements in San Jose State University’s Campus Village. Campus Village is the primary residential complex at SJSU and is comprised of a 1,000,000-SF, 5-building complex that includes a 15 story main tower. Phase 3 involved the replacement of the complex’s vertical supply risers, specific horizontal supply mains and included corrections to building life safety systems. LWJV delivered maximum value by combining the technical expertise of Lyles Mechanical Co. (LMC) with the CMAR expertise of Webcor Builders during the preconstruction and construction phases of the project. In preconstruction, the JV self-performed survey and analysis work and worked hand-in-hand with the design team, led by STRATAap, to generate the contract documents. Because the work had to be completed in just 75 calendar days, it required a fast-track bid/trade package strategy that allowed more than one sub from each trade to work on the project concurrently. During construction, both Lyles and Webcor self-performed critical tasks of the work to maintain the workflow and drive the schedule.

Design Engineer

MK2 Engineers
1428 Second Street
Nappa, CA. 94559
US

Mike Kiani
(707) 307-1500

Owner

California State University - San Jose
404 E. San Fernando Street, San Jose, CA 95112
San Jose, CA. 95112
US

Adam Bayer
(408) 924-1971

Lyles Mechanical Co.

Mike Hiatt
(559) 237-2200